Aggregat

Basel / 47.56 N, 7.59 E

Architecture practice

Housing / Public / Adaptive reuse

Index 001 — 006

Aggregat

A white concrete block cantilevers past the corner of the building below it, seen against a pale sky

Eighteen built works. One material argument: mass is not a style, it is an obligation you carry for a hundred years.

Halde 07, Basel
Completed May 2026
Photograph, north corner

Scroll

01PositionBasel, since 2011

Concrete is not a finish. It is a decision you cannot take back.

We work on buildings that have to stand for longer than the arguments that produced them. That rules out a great deal: cladding that is a drawing rather than a construction, plans that require a manual, and any detail we could not explain to the person who has to repair it in 2090.

What is left is heavy, cheap to keep, and usually made from what was already on the site. Six of our projects reused their own demolition as aggregate. One of them is made entirely of the hole it stands in.

Read the studio note

02Selected works06 of 18

Full index, 18 works

03One project, in three movesSilo 4, Rotterdam
Interior stripped to masonry with a steel prop holding an opening cut through a wall
Workers in high-visibility jackets standing on a poured slab beside a field of reinforcement bars
Corridor with black-framed glass partitions and a polished concrete floor

Move 01

Find the thing that cannot move

Sixteen slip-formed cells, 34 metres tall, built in 1931 to hold grain and daylight out. Demolition was priced at 3.4 million euros. We priced the cut instead.

Move 02

Take one thing away

A single 4-metre slot, wire-sawn over eleven weeks through the north wall of cells 6 to 11. The 410 tonnes removed were crushed on site and poured back as the aggregate in the new floors.

Move 03

Add nothing you cannot remove

Racking is freestanding, services are surface-run, saw marks are unground. The archive can be emptied in a fortnight and the silo would be a silo again.

Open project 004

04Material registerBuilt stock, 2011 to now
0

Built works

0

Competitions won

0 t

Demolition reused as aggregate

0

People, one office

Glass towers seen from street level under a heavy grey sky
05Work with usOpen for 2027

Send a site, a budget, and the deadline. In that order.

office@aggregat.ch

We take three to four commissions a year and answer every enquiry within a fortnight, including the ones we decline.

Basel / +41 61 271 04 08